Concrete is poured using conventional methods. Continuous or sectional pours are possible to fit job conditions (see Rate of Pour chart). Vibrate as required.
SUGGESTED RATE OF POUR
The Kolumn Form™ should be securely braced at top and bottom. Use a chute or tube when dropping concrete more than 10 feet. Slump should not exceed 6 inches.